Highway Bridge on river Morava in Serbia was bombed on 8th and 14th May.
Construction was entrusted to Belgrade "Mostogradnja", a work worth 41 million dinars was funded by the Corporation "Braca Karic". Before the start of construction, 2,000 cubic meters of destroyed bridge was removed, and into new columns was poured 600 cubic meters of concrete.

The bridge structure itself was built out of around 250 tonnes of reinforcement, 1,500 cubic meters of concrete, 80 tons of pre-tension rope bridge and 2300 square meters of asphalt.

The bridge is 275 meters long, 11 wide, and its commissioning is normalized traffic on the highway through the Pomoravlje district in Serbia.