Photographer’s Note
The new Howrah Bridge, the fourth cantilever bridge in the world, was commissioned (under the aegis of the then commissioners of the Port of Calcutta) in February 1943. It consumed 26,500 tons of steel and was constructed at an approximate cost of Rs. 250 lakhs. No incidents of major casualty were reported during the construction phase of the bridge.
Howrah Bridge is a suspension type balanced cantilever bridge with central span1500 ft. between centers of main towers. The Anchor arms are 325ft. and the Cantilever arms are 468 ft. long at both ends. While the middle suspended span is 564 ft., main towers are 280 ft. high above the monoliths and 76 ft. apart at the top Bridge deck width is 71 ft. with two footpaths of 15 ft. on either side.
All members of the super structure comprise built-up reverted sections with a combination of high tensile and mild steel. Between towers, bridge deck hangs from panel points in the lower chord of the main trusses with a series of hangers (39 pairs). Roadway beyond the towers is supported on ground leaving anchor arm free from deck loads. Bridge deck comprises 71 ft. carriageway and 15 ft. footway, projecting either side of the trusses and braced by longitudinal facia girder.
The Howrah Bridge has no support pillar in the middle!!!
Nobody has marked this note useful
Critiques | Translate
ashok_delhi17 (103) 2009-01-18 23:05
Wow... a great image (Have been there but photography on the bridge was never allowed)
Photo Information
- Copyright: Aman Ajmani (aman) (77)
- Genre: Places
- Medium: Color
- Date Taken: 2009-01-01
- Categories: Architecture
- Exposure: f/5.6, 1/125 seconds
- More Photo Info: view
- Photo Version: Original Version
- Date Submitted: 2009-01-18 9:17